Materials before the first draw: lay out the job by date.

On a commercial job the supplier wants paid long before the general contractor or owner pays you. Here is how to map the gap, stress-test it, and decide if funding fits.

✓ Checking what you qualify for does not affect your credit score.

Who this page is for

Updated October 13, 2026 · Merchant Fund Express

Commercial subcontractors and contractors (electrical, mechanical, concrete, roofing, flooring) who buy materials up front on a signed commercial contract and get paid on draws. This is not for residential remodeling: we do not promise funding for residential remodel work.

Construction also carries its own rules on our revenue-based tier: $500,000+ in monthly revenue, 5 years in business, 10+ deposits a month and a commercial business location. Smaller contractors can still read against our first tier (3+ years, 650+ FICO, $25,000 a month). The full sheet is on funding requirements.

The job, by date (illustrative)

A commercial electrical sub signs a $380,000 tenant fit-out. The contract pays a 10% mobilization deposit, then monthly progress draws net 30 after approval, with 10% retainage held to closeout. Switchgear and fixtures are ordered in week one.

DateEventInOut
Mar 2Contract signed; deposit invoiced
Mar 9Deposit received+$38,000
Mar 10Supplier: gear and fixtures (50% down)−$64,000
Mar 6 to Apr 3Payroll, 4 weeks−$58,000
Apr 10Supplier balance on delivery−$64,000
Apr 30Draw 1 approved ($96,000 less 10% retainage)
May 30Draw 1 paid (net 30)+$86,400

By April 10 this job has put $186,000 out and taken $38,000 in. The gap of about $148,000 closes on May 30 when the first draw pays, and only partly. Retainage of $9,600 waits until closeout.

All figures in worked examples are illustrations of the arithmetic, not offers or quotes. Real terms depend on your file and the funder.

The stress test

Run the same schedule with three things going wrong, one at a time:

What goes wrongEffectWhat it means for a payment
Draw approval slips 2 weeksGap lasts to mid-JunePayment must be carried 2 more weeks from other jobs
Owner disputes 15% of Draw 1Draw pays about $73,400About $13,000 less to repay with
Gear price rises 8% before orderSupplier total $138,200Gap grows by about $10,000

If the funding payment only works when every draw lands on time, the request is too large or the schedule is too fast. Ask for less, or pick a product whose payment is lighter while the job is in the gap.

Which product fits

Line of credit: draw for each supplier invoice and repay as draws arrive. Best fit for repeating material buys. See business line of credit.
Working capital or revenue-based funding: one lump sum for the job, repaid from deposits across all your jobs. Works when your other jobs carry the payment. See working capital.
Invoice factoring: only after you have an approved, invoiced draw. It does not fund materials before the first invoice. See contractor net-60 invoices.

When not to borrow

The job is residential remodeling.
The contract has no signed draw schedule, or the owner’s funding is unclear.
The job’s margin after materials, labor and the cost of funding is thin enough that one disputed draw makes it a loss.
You already carry two positions; see position limits.

What to send

Three months of business bank statements as PDFs, all operating accounts
The signed contract or the pages showing value, deposit, draw schedule and retainage
The supplier quote or invoice for the materials
A short list of open jobs and when their draws are due

Then check what you qualify for; checking does not affect your credit score. More on construction products is on the construction funding page.

Keep reading

Common questions

Can I get funding for materials before a commercial job starts?

Yes, for commercial work that fits the published construction rules. The funder reads your bank deposits across all jobs, plus the contract and supplier invoice for this one.

Do you fund residential remodeling contractors?

We do not promise funding for residential remodel work. Commercial contractors are reviewed against the construction rules on our requirements page.

How does retainage affect the cash gap?

Retainage holds back part of every draw, often 5% to 10%, until closeout. Leave it out of the money you plan to repay with, because it arrives months later.

Is factoring an option before the first draw?

No. Factoring needs an approved invoice. Before the first draw, a line of credit or working capital is the fit.

What if a draw is late?

Plan for it. Run the schedule with the first draw two weeks late. If the payment cannot be carried from other jobs for those two weeks, reduce the amount.